Siemens Gamesa, one of the world's leaders in renewable energy capabilities, is taking its business to Scotland through a new turbine order allowing the firm to expand its footprint with 60 SG 14-222 DD offshore wind turbines at its 882-MW Moray West facility. Following the installation process, the 882-MW Moray West wind farm will inevitably become home to the world's most advanced wind turbine.
The firm is attempting to fast-track the deployment and installation as quickly as possible, allotting a potential time frame of 2024 as being the year the first Siemens Gamesa wind turbines are installed and officially produce renewable energy. The company will be manufacturing the massive wind turbines at its offshore blade factory in Hull, England, wherein a total of 180 Siemens Gamesa B108 IntegralBlades will be produced for the 60 turbines.
Each Siemens Gamesa wind turbine of the 14-222 DD bunch has a rotor diameter of 222 meters, showcasing the immense scale of the products. The firm displayed early prototypes of the SG14-222 DD being installed in a YouTube video published back in Nov. 2021. In Dec., the prototype delivered its first bout of energy to the grid at the company's test center in Denmark.
Related Article: Europe Cyberattack Results to 'Massive' Internet Outage | About 5,800 Wind Turbines Went Offline
Siemens Gamesa has been making massive strides of late, witnessed via its more recent Acta Marine vessel charter for support and construction of France-based offshore wind farms. Additionally, the renewable energy firm recently won a case against GE, which saw Siemens Gamesa not, in fact utilizing already existing patented designs of structural supports on its wind turbines.
Although the Siemens Gamesa wind turbines in Scotland may well be fitted with the title of most powerful for the time being, they most likely won't keep that status for too long. Similarly situated renewable energy company Vestas is also pushing headlong into the advanced wind farm fold. In February 2021, the company launched a new wind turbine called the V236-15.0MW, which boasts a design lifetime of 25 years or more.
Vestas recently was granted a conditional order agreement to the German-based EnBW 900 MW He Dreiht offshore wind farm by 2025. The firm will be implementing a total of 64 V235-15.0 MW wind turbines into the German facility, allotting the site a massive supply of newfound renewable energy that will seemingly outlast and outperform those of Siemens Gamesa's in Scotland.